Posted on February 10, 2017June 10, 2021 by AmyConstruction Updates – click for gallery 2/5/17 2/5/17 2/5/17 Plumbing started 2/14/16 2/23/17 Old extra door space removed. 2/23/17 Door removed. Waiting for a window. 2/23/17 plumbing for new layout 2/23/17 new line for tap wall 2/23/17 sphere sphere 3/1/17 3/1/17 concrete will be poured soon filled, covered and ready for concrete to be poured 3/2/17 sphere 3/2/17 3/2/17 3/4/17 sphere with cement! 3/4/17 view from the front door 3/4/17 view from the back door 3/4/17 view from where the bar will be 3/6/17 walls and framing arriving 3/6/17 framing delivered 3/6/17 Getting to work 3/6/17 starting the walls 3/7/17 Bathroom walls are framed 3/7/17 HVAC and framing 3/7/17 Back Hallway 3/7/17 Walls are going up 3/7/17 sphere 3/16/17 Sign is going up 3/16/17 Window replaces old door 3/16/17 Drywall going up 3/28/17 Painting the ceiling 3/28/17 Casters on the Cooler 3/28/17 Outside 3/28/17 Sphere 42517 4417 Permits have cleared, we’re starting construction! We’re looking at opening in April. Can’t wait to see you!